Welcome to KBHDoors

Case Studies

Low rise FED renewals

KBH Doors were very accommodating of my particular situation. Living on the ground floor adjacent to a main road with three young children, I am very careful to ensure the children never have unsupervised access beyond the front door.

New build FED’s

KBH doors worked in tandem with the principal contractor to ensure all doors were delivered to site and installed as per the agreed programme, and ensured no disruption was felt by the multiple trades that occupied the site at the same stage of the works.

Upgrades to existing fire doors – Communal

KBH doors presided over a dynamic schedule of works, including but not limited to the replacement of intumescent fire strips, the installation of fire-rated fan lights and vision panels, and the replacement of hinges.

1-17 Peabody Estate, Cambridge Crescent, London

1-17 Peabody Estate, Cambridge Crescent, London

1-17 Peabody Estate, Cambridge Crescent, London

1-17 Peabody Estate, Cambridge Crescent, London






  • FAST LEAD TIME

    We can manufacture and deliver a fully customized door, only 25 calendar days after an order is placed.

  • FLEXIBLE PAYMENT

    We accept payment by bank transfer, Paypal, Credit/Debit card online or over the phone.

  • GUARANTEED QUALITY

    Quality Management Control to ISO9001 and 3rd party auditing from industry leaders.